图片 | 型号 | 库存 | 数量 | 规格书 | 系列 | 包装 | 产品状态 | 主要用途 | 输出及类型 | 电压 - 输出 | 电流 - 输出 | 电压 - 输入 | 稳压器拓扑 | 频率 - 开关 | 内容物 | 使用的 IC / 部件 | 功率 - 输出 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
LP87642Q1EVMEVAL BOARD FOR LP8764Q1 Texas Instruments |
4,164 |
|
![]() 规格书 |
- | Box | Active | DC/DC, Step Down | 1 Non-Isolated Output | - | - | 20A | 3V ~ 5.5V | Buck | 2.2MHz | Board(s), Cable(s) | LP8764-Q1 |
![]() |
UC1825BEVM-CVALEVAL BOARD FOR UC1825BSP Texas Instruments |
4,798 |
|
![]() 规格书 |
- | Box | Active | DC/DC, Step Down | 1 Isolated Output | - | 5V | 10A | 22V ~ 48V | - | 215kHz | Board(s) | UC1825B-SP |
|
TPS75003EVM-092EVAL BOARD FOR TPS75003 Texas Instruments |
2,765 |
|
![]() 规格书 |
- | Box | Active | DC/DC, Step Down with LDO | 3 Non-Isolated Outputs | - | 1.22V, 2.5V, 3.3V | 2A, 2A, 300mA | 2.2V ~ 6.5V | Buck | - | Board(s) | TPS75003 |
![]() |
TPS60241EVM-194EVAL BOARD FOR TPS60241 Texas Instruments |
3,980 |
|
![]() 规格书 |
- | Bulk | Active | DC/DC, Step Up or Down | 1 Non-Isolated Output | - | 5V | 25mA | 2.7V ~ 5.5V | Buck-Boost | - | Board(s) | TPS60241 |
|
TPS54262EVMEVAL BOARD FOR TPS54262 Texas Instruments |
4,511 |
|
![]() 规格书 |
- | Box | Active | DC/DC, Step Down | 1 Non-Isolated Output | - | - | 2A | 3.6V ~ 48V | Buck | - | Board(s) | TPS54262 |
![]() |
TPS62A02APEVM-018EVAL BOARD FOR TPS62A02A Texas Instruments |
1,616 |
|
![]() 规格书 |
- | Box | Active | DC/DC, Step Down | 1 Non-Isolated Output | - | 1.8V | 2A | 2.5V ~ 5.5V | Buck | 2.4MHz | Board(s) | TPS62A02A |
![]() |
TPS56837HEVMEVAL BOARD FOR TPS56837H Texas Instruments |
1,545 |
|
![]() 规格书 |
- | Box | Active | DC/DC, Step Down | 1 Non-Isolated Output | - | 15V | 8A | 4.5V ~ 28V | Buck | 500kHz | Board(s) | TPS56837H |
![]() |
TPS56837EVMEVAL BOARD FOR TPS56837 Texas Instruments |
3,224 |
|
![]() 规格书 |
D-CAP3™ | Box | Active | DC/DC, Step Down | 1 Non-Isolated Output | - | 5V | 8A | 5.5V ~ 28V | Buck | - | Board(s) | TPS56837 |
![]() |
TPSM64406EVMEVAL BOARD FOR TPSM64406 Texas Instruments |
2,373 |
|
![]() 规格书 |
- | Box | Active | DC/DC, Step Down | 2 Non-Isolated Outputs | - | 3.3V, 5V | 3A | 6.3V ~ 36V | Buck | 1MHz | Board(s) | TPSM64406 |
![]() |
TPS62A02PEVM-018EVAL BOARD FOR TPS62A02 Texas Instruments |
1,192 |
|
![]() 规格书 |
- | Box | Active | DC/DC, Step Down | 1 Non-Isolated Output | - | 1.8V | 2A | 2.5V ~ 5.5V | Buck | 2.4MHz | Board(s) | TPS62A02 |